Today were the first test runs of the Coastal Titans Railroad. The initial segments of track, where the future station will be built, was completed and signed off. Below are videos of the near-final testing of the track and the sign-off run once all risers were leveled and secured.
Construction can now begin on segments of track going through the dense foliage.
Initial running to test the track:
This made sure that the track was smooth and stable.
Sign-off run:
This was after all the risers were leveled and secured. The track is now operational.